skip to main content
Public Works Committee Meeting - 1.30.2024
Approval of the Minutes
New Petitions for Review: 254-23. Install a berm at 405 Blossom St
NEW petitions for review: a) 254-23. Councilors Squailia and Van Hazinga to install a berm at 405 Blossom St from the driveway to the existing storm drain to mitigate water intrusion into the landscaped area and sidewalk, approx 50'. Request DPW review height of Driveway Apron as may need to be raised up to direct water flow towards storm drain. (Referred from City Council on November 8, 2023)
New Petitions for Review: 255-23. Install a berm at 75 Klondike Ave
255-23. Marisa Fleming on behalf of Dan Sarasin of 75 Klondike Ave to install a berm in front of his property to mitigate flooding from the higher ground across the street. (Referred from City Council on November 8, 2023)
New Petitions for Review: 256-23. Request a berm at the intersection of Oak Hill/Franklin Road
256-23. Andrew Couture on behalf of Brian Rufiange to request a berm to be placed from the intersection of Oak Hill to the storm drain just past 394 Franklin Rd.(Referred from City Council on November 8, 2023)
New Petitions for Review: 257-23 To remove a large stump at 264 Elm St.
257-23. Councilor Sam Squailia to remove the large stump in front of 264 Elm St. This stump juts into the roadway and is often obscured due to weed overgrowth, causing damage to vehicles trying to park on the street. (Referred from City Council on November 8, 2023)
Held petitions for review: 193-23. to replace the berm at 466 Franklin Road
HELD petitions for review: a) 193-23. City Councilor Andrew Couture, on behalf of Bev Hofer, to replace the berm in front of 466 Franklin Road to combat runoff from Oak Hill Road. (HELD at the 7/25/23 and 10/26/23 meetings)
Vote to approve meeting dates for 2024
DPW Updates